Turner River Bridge Project
Bridge Project for BHP - Located 112kms from Port Hedland along the Newman Hedland railway in the Pilbara Region of WA.
Duplication of exisiting bridge with upgrade to dual carriageway.
Main Construction Requirements : -
• Prepare Causeway area with pad for construction
• Install pile sleeves with rock sockets in River Bed
• Add Headstocks to top of pile sleeves
• Install Girders with bearings across headstocks
• Construct concrete abutments for approaches
• Prepare rail formation for new mainline track, duplicate track and temporary track
Asphar Survey successfully completed the survey requirements for the project alongside the JHG surveyors.

