Murrin Murrin
Asphar Survey were engaged to carry out some survey requirements for expansion plans at Murrin Murrin Nickel Operations through Ausenco and Worley Parsons.
The survey requirements included:
1st Order Control Installation Throughout the Refinery.
This included reciprocal observations using a Total station and digital level. All obs were carried out during cooler parts of the day reducing the effects temperature and atmospherics have on critical observations.

Dimensional Surveys of existing structures for the installation of new piperacks.
These observations were carried out over a 2 month period, gathering critical dimensional information for reverse engineering and planning.